Ulster Hospital Car Park Repair and refurbishment of 2 levels of a 10-level steel-framed car park. H+H managed a range of concrete repairs, and the reinstatement of a protective paint system to provide 15 years protection to first major maintenance. 15 Traffic management proved to be a.
Before and After! Culloden Spa extension involved the construction of a new sauna and jacuzzi pool connecting into the curved faade of the existing spa and pool area. Complex substructure design was required to enable underground pipework network to connect to the sunken pool. Full height glazing.
Progress report: on-site at Hopewell Crescent, Belfast for the Phase 1 Road Handover. Together with Radius housing we are building new houses and apartments and they are starting to take shape!#HannaandHutchin son #StructuralEngin eering #NewHousing #Development #Phase1
Blue skies and clear water at Hinch Distillery! We have designed a number of underground tanks here which incorporated treatment processes to the distillery discharge. These tanks were designed to cope with varying construction scenarios in addition to vehicle loading.#HannaandHutchin son #.
McCausland Multi-Storey Car Park on Grosvenor Road Belfast opened last August. -Concrete-frame d multi-storey car park on 12 split-levels. 12 - Approximately 500 spaces! - CFA piled foundations. - Precast concrete stairs within 2 lift cores, each of 2 lifts. - Waterproof concrete at.